Brodhead Road Waterline Improvements – Center Township Water Authority

Broadhead Road Waterline Improvements – Center Township Water Authority

LSSE’s scope of work for this waterline replacement project included preliminary design; hydraulic modeling; utility coordination; permitting; final design and construction phase services (full-time resident project representation and shop drawing review) for installation of approximately 5,900 LF of 16-inch waterline along State Route 3007 (Brodhead Road) in Center Township, Beaver County, Pennsylvania. Work was completed during nighttime hours as a result of traffic volume and PennDOT daylight working hour restrictions, and in accordance with an accelerated schedule as dictated by PennDOT in advance of roadway resurfacing.

This project was necessary to replace aging parallel water distribution mains that required frequent maintenance along this high-traffic state roadway within a primarily commercial district.  A hydraulic modeling study was completed, and determined that a single 16-inch waterline would be the optimal size waterline to replace the existing parallel 12-inch and 8-inch waterlines.

Final design and layout included preparation of rights-of-way exhibits and meetings with property owners (residential and commercial) to secure necessary easements to relocate the new 16-inch waterline outside of the PennDOT right-of-way within private easements, where feasible, to accommodate future operational considerations within this high-traffic PennDOT roadway.  This project included the development and review of different alignment alternatives with the Owner, with consideration of intersecting waterline tie-ins/reconnections, construction cost, location of existing utilities, and future maintenance needs.

The PennDOT RNA stipulated restrictive daylight working hours; therefore, construction was performed during nighttime / off-peak hours. LSSE provided full-time resident project representation and construction engineering services for the duration of construction. This project was completed under budget, ahead of schedule, with no Alleged Violation Reports (AVRs) and minimal construction-related complaints from adjoining property owners or motorists.

MARKETS:

  • Utilities and Infrastructure

SERVICES:

  • Civil – Environmental Engineering
    • Potable Water Facilities Engineering
  • Surveying
Martinsburg Nitrate Removal Water Treatment System Duquesne University – Murphy’s Bottom Ecological Project North Sewickley Township Sewage Facilities Collection Elkhorn Run Sewage Treatment Plant Headworks Improvements Oak Grove Road Stormwater Improvements Road Program Summary Map – Baldwin Borough BASF Water Service Connection Beech Street & Elmer Street Stormwater Improvements – Edgewood Borough Center Township Municipal Building Renovations Peoples Natural Gas Allegheny Valley School District Engineering Services Erie East Bay Front Greenway Trail Flood Protection Project – Tucker County, West Virginia  Carnegie Mellon University Collier Township Community Park Pleasant Hills Borough Wet Weather Facilities Moon Township Parks Pennsylvania American Waterline Projects Representative Louisiana Avenue Stormwater Improvement Findlay Industrial Park – Phase 1 Gordon Food Service (GFS) Distribution Center Chapman Westport Hillwood Development – Parcel A North Fayette Township Zoning Map The Home Depot Donohoe Road Sanitary Sewer Extension Linesville Borough – Water System Improvements Moon Township Police Station Neville Township Water Distribution System ALMONO – Mill 19 Hempfield Area School District Stormwater Management Improvements Ridgeview Estates Leetsdale Industrial Park Pleasant Hills Municipal Building Brodhead Road Waterline Improvements – Center Township Water Authority 3 Rivers Wet Weather, Inc. Program Manager Contract Castlewood Fields GetGo Indiana University of Pennsylvania FEMA LOMR Columbia Gas Utah Street Waterline Replacement – Neville Township South Home Stormwater Improvements Martinsburg Municipal Authority Wastewater Treatment Plant Westport Ridge Building No. 2  & 3 Oakwood Manor Castle Shannon Borough Grove Road Bridge Reconstruction Moon Township Public Works Garage Pilot – Findlay Location North Fayette Trail Connector Coraopolis Water System Improvements Bridgewater Crossing – Brownfield Redevelopment NPDES Compliance & Long-Term Control – West Newton Borough McKay Street Stormwater Improvements Center Township Potable Water FedEx Ground National Expansion Program Edinboro University – Infrastructure Upgrade Southmoreland High School Parking Lot Stormwater Improvements Findlay Industrial Park – Phase 4 Pine Synthetic Fields Castle Shannon Borough Parks Washington Mall Redevelopment – Demolition Elkhorn Run STP Final Clarifier Rehabilitation North Fayette Community Center Municipal Water Authority of Aliquippa – Water Filtration Plant Pleasant Hills Breisinger Field Tuscan Hills Development Baldwin Colewood Interceptor Upgrades and Rehabilitation, Equalization Ambridge Water Authority Partial Hydraulic Model Flow Test Map Findlay Industrial Park – Phase 3 Center Township Park Improvements Mapping and Facilities Water System Study & Improvements – Brighton Township Municipal Authority Findlay Industrial Park – Phase 2 3 Rivers Wet Weather Green Stormwater Infrastructure Feasibility Study Braddock Lock and Dam G.E. Additive Technology Building Coraopolis Riverfront Park Villas of South Park Ridge Road Industrial Park Brighton Road Lift Station Improvements Westport Ridge Building 1 Pheasant Crossing Residential Development Village of Lawrence Sewage Facilities Project North Fayette Township Municipal Complex / Public Works Garage Charles E. Kelly Recreation Park – Collier Township Donovan Farms Sanitary Sewer CCTV & Manhole / Point Source Repairs – Oklahoma Borough South Side Works Coraopolis GIS Program Clintonville Water Storage Tank Borough of Seven Fields First Energy Nuclear Operating Company (FENOC) Walker Park Stream Restoration – Edgeworth Borough