Brodhead Road Waterline Improvements – Center Township Water Authority

Broadhead Road Waterline Improvements – Center Township Water Authority

LSSE’s scope of work for this waterline replacement project included preliminary design; hydraulic modeling; utility coordination; permitting; final design and construction phase services (full-time resident project representation and shop drawing review) for installation of approximately 5,900 LF of 16-inch waterline along State Route 3007 (Brodhead Road) in Center Township, Beaver County, Pennsylvania. Work was completed during nighttime hours as a result of traffic volume and PennDOT daylight working hour restrictions, and in accordance with an accelerated schedule as dictated by PennDOT in advance of roadway resurfacing.

This project was necessary to replace aging parallel water distribution mains that required frequent maintenance along this high-traffic state roadway within a primarily commercial district.  A hydraulic modeling study was completed, and determined that a single 16-inch waterline would be the optimal size waterline to replace the existing parallel 12-inch and 8-inch waterlines.

Final design and layout included preparation of rights-of-way exhibits and meetings with property owners (residential and commercial) to secure necessary easements to relocate the new 16-inch waterline outside of the PennDOT right-of-way within private easements, where feasible, to accommodate future operational considerations within this high-traffic PennDOT roadway.  This project included the development and review of different alignment alternatives with the Owner, with consideration of intersecting waterline tie-ins/reconnections, construction cost, location of existing utilities, and future maintenance needs.

The PennDOT RNA stipulated restrictive daylight working hours; therefore, construction was performed during nighttime / off-peak hours. LSSE provided full-time resident project representation and construction engineering services for the duration of construction. This project was completed under budget, ahead of schedule, with no Alleged Violation Reports (AVRs) and minimal construction-related complaints from adjoining property owners or motorists.

MARKETS:

  • Utilities and Infrastructure

SERVICES:

  • Civil – Environmental Engineering
    • Potable Water Facilities Engineering
  • Surveying
Charles E. Kelly Recreation Park – Collier Township Brodhead Road Waterline Improvements – Center Township Water Authority ALMONO – Mill 19 NPDES Compliance & Long-Term Control – West Newton Borough Leetsdale Industrial Park Chapman Westport Hillwood Development – Parcel A Flood Protection Project – Tucker County, West Virginia  Donovan Farms Washington Mall Redevelopment – Demolition McKay Street Stormwater Improvements Columbia Gas Villas of South Park Brighton Road Lift Station Improvements Linesville Borough – Water System Improvements Utah Street Waterline Replacement – Neville Township Donohoe Road Sanitary Sewer Extension Pleasant Hills Municipal Building Coraopolis Water System Improvements Pennsylvania American Waterline Projects Representative 3 Rivers Wet Weather Green Stormwater Infrastructure Feasibility Study North Fayette Township Zoning Map Village of Lawrence Sewage Facilities Project First Energy Nuclear Operating Company (FENOC) Hempfield Area School District Stormwater Management Improvements North Fayette Trail Connector Castlewood Fields Castle Shannon Borough Grove Road Bridge Reconstruction Southmoreland High School Parking Lot Stormwater Improvements Baldwin Colewood Interceptor Upgrades and Rehabilitation, Equalization Oak Grove Road Stormwater Improvements Indiana University of Pennsylvania FEMA LOMR Louisiana Avenue Stormwater Improvement Water System Study & Improvements – Brighton Township Municipal Authority Findlay Industrial Park – Phase 3 Elkhorn Run Sewage Treatment Plant Headworks Improvements Pleasant Hills Breisinger Field Moon Township Police Station Oakwood Manor Gordon Food Service (GFS) Distribution Center Beech Street & Elmer Street Stormwater Improvements – Edgewood Borough Martinsburg Municipal Authority Wastewater Treatment Plant South Home Stormwater Improvements Tuscan Hills Development The Home Depot Pleasant Hills Borough Wet Weather Facilities North Fayette Community Center Coraopolis Riverfront Park Findlay Industrial Park – Phase 2 Pilot – Findlay Location Neville Township Water Distribution System Westport Ridge Building No. 2  & 3 Walker Park Stream Restoration – Edgeworth Borough Moon Township Public Works Garage Erie East Bay Front Greenway Trail GetGo Duquesne University – Murphy’s Bottom Ecological Project 3 Rivers Wet Weather, Inc. Program Manager Contract Ridgeview Estates Center Township Municipal Building Renovations Borough of Seven Fields Moon Township Parks Collier Township Community Park Sanitary Sewer CCTV & Manhole / Point Source Repairs – Oklahoma Borough Findlay Industrial Park – Phase 4 Martinsburg Nitrate Removal Water Treatment System Center Township Park Improvements Ambridge Water Authority Partial Hydraulic Model Flow Test Map Westport Ridge Building 1 G.E. Additive Technology Building North Sewickley Township Sewage Facilities Collection FedEx Ground National Expansion Program Center Township Potable Water Pine Synthetic Fields Braddock Lock and Dam Elkhorn Run STP Final Clarifier Rehabilitation Castle Shannon Borough Parks Mapping and Facilities Edinboro University – Infrastructure Upgrade Coraopolis GIS Program Ridge Road Industrial Park Municipal Water Authority of Aliquippa – Water Filtration Plant Bridgewater Crossing – Brownfield Redevelopment Allegheny Valley School District Engineering Services Pheasant Crossing Residential Development Road Program Summary Map – Baldwin Borough Clintonville Water Storage Tank North Fayette Township Municipal Complex / Public Works Garage Peoples Natural Gas BASF Water Service Connection South Side Works Findlay Industrial Park – Phase 1 Carnegie Mellon University